{"id":29834,"date":"2023-12-20T11:04:52","date_gmt":"2023-12-20T19:04:52","guid":{"rendered":"https:\/\/agileeducation.org\/?post_type=glossary&#038;p=29834"},"modified":"2023-12-20T11:04:53","modified_gmt":"2023-12-20T19:04:53","slug":"sprint-backlog","status":"publish","type":"glossary","link":"https:\/\/agileeducation.org\/zh\/glossary\/sprint-backlog\/","title":{"rendered":"\u51b2\u523a\u79ef\u538b"},"content":{"rendered":"<p>The set of <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Product Backlog&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;A priority ordered list of everything that is known to be needed in the product. It is the single source of requirements for any changes to be made to the product. The Product Owner is responsible for the Product Backlog, including its content, availability, and ordering.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/product-backlog\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Product Backlog<\/a> Items selected for the <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Sprint&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;One of the five Scrum Events. It is a short, consistent cycle no longer than four weeks. The goal is to have an iteration short enough to keep the team focused but long enough to deliver a meaningful increment of work. All other Scrum Events take place during a Sprint. Once a Sprint is finished, the next begins.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/sprint\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Sprint<\/a>, plus a plan for delivering the <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Increment&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;An Increment (sometimes referred to as a &amp;#039;Potentially Shippable Product&amp;#039;) is the value delivered for the customer via the Product Backlog Items completed during a Sprint. Each Increment should interface seamlessly with all prior Increments and stand alone as a distinct addition of value to the Product. While more than one Increment may be created in a Sprint, all work must meet the Definition of Done to be considered complete.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/increment\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Increment<\/a> and realizing the <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Sprint Goal&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;The Sprint Goal is the singular objective for the Sprint. The Sprint Goal is the COMMITMENT of everyone working on the sprint increment, providing the clarity to understand what is needed, who needs it, why it is needed, or how it will provide value. The Sprint Goal helps create focus and alignment, encouraging the Scrum Team to work together to produce the value rather than on separate or individual efforts.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/sprint-goal\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Sprint Goal<\/a>. It includes at least one Improvement identified at the last <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Sprint Retrospective&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;One of the five Scrum Events. An opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint. This event occurs after the Sprint Review and prior to the next Sprint Planning. At most a three-hour meeting for one-month Sprints.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/sprint-retrospective\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Sprint Retrospective<\/a>. It makes visible all of the work the Team identifies as necessary to meet the <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Sprint Goal&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;The Sprint Goal is the singular objective for the Sprint. The Sprint Goal is the COMMITMENT of everyone working on the sprint increment, providing the clarity to understand what is needed, who needs it, why it is needed, or how it will provide value. The Sprint Goal helps create focus and alignment, encouraging the Scrum Team to work together to produce the value rather than on separate or individual efforts.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/sprint-goal\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Sprint Goal<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The set of <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Product Backlog&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;A priority ordered list of everything that is known to be needed in the product. It is the single source of requirements for any changes to be made to the product. The Product Owner is responsible for the Product Backlog, including its content, availability, and ordering.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/product-backlog\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Product Backlog<\/a> Items selected for the <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Sprint&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;One of the five Scrum Events. It is a short, consistent cycle no longer than four weeks. The goal is to have an iteration short enough to keep the team focused but long enough to deliver a meaningful increment of work. All other Scrum Events take place during a Sprint. Once a Sprint is finished, the next begins.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/sprint\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Sprint<\/a>, plus a plan for delivering the <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Increment&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;An Increment (sometimes referred to as a &amp;#039;Potentially Shippable Product&amp;#039;) is the value delivered for the customer via the Product Backlog Items completed during a Sprint. Each Increment should interface seamlessly with all prior Increments and stand alone as a distinct addition of value to the Product. While more than one Increment may be created in a Sprint, all work must meet the Definition of Done to be considered complete.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/increment\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Increment<\/a> and realizing the <a class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Sprint Goal&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;&amp;lt;!-- wp:paragraph --&amp;gt;The Sprint Goal is the singular objective for the Sprint. The Sprint Goal is the COMMITMENT of everyone working on the sprint increment, providing the clarity to understand what is needed, who needs it, why it is needed, or how it will provide value. The Sprint Goal helps create focus and alignment, encouraging the Scrum Team to work together to produce the value rather than on separate or individual efforts.&amp;lt;br\/&amp;gt;&amp;lt;!-- \/wp:paragraph --&amp;gt;&lt;\/div&gt;\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/sprint-goal\/\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Sprint Goal<\/a>. It includes at least one Improvement identified at [&#x2026;]<\/p>\n","protected":false},"author":21,"featured_media":0,"menu_order":0,"template":"","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","footnotes":""},"class_list":["post-29834","glossary","type-glossary","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sprint Backlog - Agile Education by Scrum Inc.<\/title>\n<meta name=\"description\" content=\"The set of Product Backlog Items selected for the Sprint, plus a plan for delivering the Increment and realizing the Sprint Goal. It includes at least one Improvement identified at the last Sprint Retrospective. It makes visible all of the work the Team identifies as necessary to meet the Sprint Goal.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/agileeducation.org\/zh\/glossary\/sprint-backlog\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sprint Backlog - Agile Education by Scrum Inc.\" \/>\n<meta property=\"og:description\" content=\"The set of Product Backlog Items selected for the Sprint, plus a plan for delivering the Increment and realizing the Sprint Goal. It includes at least one Improvement identified at the last Sprint Retrospective. It makes visible all of the work the Team identifies as necessary to meet the Sprint Goal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/agileeducation.org\/zh\/glossary\/sprint-backlog\/\" \/>\n<meta property=\"og:site_name\" content=\"Agile Education by Scrum Inc.\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-20T19:04:53+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/agileeducation.org\\\/glossary\\\/sprint-backlog\\\/\",\"url\":\"https:\\\/\\\/agileeducation.org\\\/glossary\\\/sprint-backlog\\\/\",\"name\":\"Sprint Backlog - Agile Education by Scrum Inc.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/agileeducation.org\\\/#website\"},\"datePublished\":\"2023-12-20T19:04:52+00:00\",\"dateModified\":\"2023-12-20T19:04:53+00:00\",\"description\":\"The set of Product Backlog Items selected for the Sprint, plus a plan for delivering the Increment and realizing the Sprint Goal. It includes at least one Improvement identified at the last Sprint Retrospective. It makes visible all of the work the Team identifies as necessary to meet the Sprint Goal.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/agileeducation.org\\\/glossary\\\/sprint-backlog\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/agileeducation.org\\\/glossary\\\/sprint-backlog\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/agileeducation.org\\\/glossary\\\/sprint-backlog\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/agileeducation.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sprint Backlog\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/agileeducation.org\\\/#website\",\"url\":\"https:\\\/\\\/agileeducation.org\\\/\",\"name\":\"Agile Education by Scrum Inc.\",\"description\":\"Better Results. Starting Now.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/agileeducation.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u51b2\u523a\u5f85\u529e\u4e8b\u9879 - Agile Education \u81f3 Scrum Inc.","description":"\u4e3a\u51b2\u523a\u9009\u5b9a\u7684\u4ea7\u54c1\u5f85\u529e\u4e8b\u9879\u96c6\u5408\uff0c\u5916\u52a0\u4ea4\u4ed8\u589e\u91cf\u5e76\u5b9e\u73b0\u51b2\u523a\u76ee\u6807\u7684\u8ba1\u5212\u3002\u5176\u4e2d\u81f3\u5c11\u5305\u542b\u4e0a\u4e00\u8f6e\u51b2\u523a\u56de\u987e\u4e2d\u786e\u5b9a\u7684\u4e00\u9879\u6539\u8fdb\u63aa\u65bd\u3002\u8be5\u96c6\u5408\u6e05\u6670\u5448\u73b0\u56e2\u961f\u4e3a\u8fbe\u6210\u51b2\u523a\u76ee\u6807\u6240\u8ba4\u5b9a\u7684\u5168\u90e8\u5fc5\u8981\u5de5\u4f5c\u3002.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/agileeducation.org\/zh\/glossary\/sprint-backlog\/","og_locale":"zh_CN","og_type":"article","og_title":"Sprint Backlog - Agile Education by Scrum Inc.","og_description":"The set of Product Backlog Items selected for the Sprint, plus a plan for delivering the Increment and realizing the Sprint Goal. It includes at least one Improvement identified at the last Sprint Retrospective. It makes visible all of the work the Team identifies as necessary to meet the Sprint Goal.","og_url":"https:\/\/agileeducation.org\/zh\/glossary\/sprint-backlog\/","og_site_name":"Agile Education by Scrum Inc.","article_modified_time":"2023-12-20T19:04:53+00:00","twitter_card":"summary_large_image","twitter_misc":{"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"1 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/agileeducation.org\/glossary\/sprint-backlog\/","url":"https:\/\/agileeducation.org\/glossary\/sprint-backlog\/","name":"\u51b2\u523a\u5f85\u529e\u4e8b\u9879 - Agile Education \u81f3 Scrum Inc.","isPartOf":{"@id":"https:\/\/agileeducation.org\/#website"},"datePublished":"2023-12-20T19:04:52+00:00","dateModified":"2023-12-20T19:04:53+00:00","description":"\u4e3a\u51b2\u523a\u9009\u5b9a\u7684\u4ea7\u54c1\u5f85\u529e\u4e8b\u9879\u96c6\u5408\uff0c\u5916\u52a0\u4ea4\u4ed8\u589e\u91cf\u5e76\u5b9e\u73b0\u51b2\u523a\u76ee\u6807\u7684\u8ba1\u5212\u3002\u5176\u4e2d\u81f3\u5c11\u5305\u542b\u4e0a\u4e00\u8f6e\u51b2\u523a\u56de\u987e\u4e2d\u786e\u5b9a\u7684\u4e00\u9879\u6539\u8fdb\u63aa\u65bd\u3002\u8be5\u96c6\u5408\u6e05\u6670\u5448\u73b0\u56e2\u961f\u4e3a\u8fbe\u6210\u51b2\u523a\u76ee\u6807\u6240\u8ba4\u5b9a\u7684\u5168\u90e8\u5fc5\u8981\u5de5\u4f5c\u3002.","breadcrumb":{"@id":"https:\/\/agileeducation.org\/glossary\/sprint-backlog\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/agileeducation.org\/glossary\/sprint-backlog\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/agileeducation.org\/glossary\/sprint-backlog\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/agileeducation.org\/"},{"@type":"ListItem","position":2,"name":"Sprint Backlog"}]},{"@type":"WebSite","@id":"https:\/\/agileeducation.org\/#website","url":"https:\/\/agileeducation.org\/","name":"Agile Education by Scrum Inc.","description":"\u66f4\u597d\u7684\u7ed3\u679c\u3002\u4ece\u73b0\u5728\u5f00\u59cb","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/agileeducation.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"}]}},"_links":{"self":[{"href":"https:\/\/agileeducation.org\/zh\/wp-json\/wp\/v2\/glossary\/29834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/agileeducation.org\/zh\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/agileeducation.org\/zh\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/agileeducation.org\/zh\/wp-json\/wp\/v2\/users\/21"}],"version-history":[{"count":0,"href":"https:\/\/agileeducation.org\/zh\/wp-json\/wp\/v2\/glossary\/29834\/revisions"}],"wp:attachment":[{"href":"https:\/\/agileeducation.org\/zh\/wp-json\/wp\/v2\/media?parent=29834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}